PLEASE NOTE: The Draft Basic Assessment Report for the above-mentioned project is available for a 30-Day review and commenting period from 2 August 2024 – 3 September 2024. Kindly forward your written comments to Madeleine Knoetze at email: madeleine@sescc.net; fax: 086 575 2869; or postal address: P.O. Box 443, Milnerton, 7435 on or before 3 September 2024.
NEEM ASSEBLIEF KENNIS: Die Basiese Assesseringverslag van die bogenoemde projek is beskikbaar vir ‘n 30-dae resensie- en kommentaarlewerings periode, vanaf 2 Augustus 2024 – 3 September 2024. Stuur asseblief u geskrewe kommentare deur na Madeleine Knoetze deur middel van ‘n epos: madeleine@sescc.net; faks: 086 575 2869; of posadres: Posbus 443, Milnerton, 7435 op, of voor 3 September 2024.
Alternatively, comments can be submitted through following the following links/Alternatiewelik kan kommentaar op die voorgestelde projek deur middel van die volgende skakels ingedien word:
Kindly see the link to the posters compiled for the Public Open Day held on the 6th of August 2024 here: Public open day posters
Main Report
Appendices
Annexure A – Locality Maps and coordinates
Annexure B – Base map of proposed infrastructure
Annexure C – Proposed Development Site Layout plan
Annexure D – Biodiversity Maps
Annexure E – Site Sensitivity Overlay maps
Appendix F1 – Interested and Affected Parties Database_public
Appendix F2 – Pre-Application Public Participation undertaken
Annexure G – Site Photographs
Annexure H – Technical Information and SWMP
Appendix I1 – Agricultural Assessment
Appendix I2 – Visual Impact Assessment
Appendix I3 – Heritage Impact Assessment_Phase 1
Appendix I4 – Terrestrial Biodiversity Impact Assessment
Appendix I5 – Bats Impact Assessment
Appendix I6 – Avifaunal Impact Assessment
Appendix I7 – Palaeontological Impact Assessment
Appendix I8 – Aquatic Biodiversity Impact Assessment
Appendix I9 – Defense Compliance Statement
Appendix I10 – Civil Aviation Compliance Statement
Appendix I11 – RFI Assessment
Appendix I12 – Noise Impact Assessment
Appendix I13 – Traffic Impact Assessment
Appendix I14 – Geotechnical Desktop Assessment
Appendix I15 – Socio-Economic Impact Assessment
Appendix J1 – Site Specific Environmental Management Programme
Appendix J2 – Generic EMPr – IPP Substation_MKWP_250724
Appendix K1 – Declaration of Independence EAP and Specialists
Appendix K2 – Curriculum Vitae of the EAPs