Latest News

Facebook

Facebook Pagelike Widget

DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED MULILO KAROO WIND POWER DEVELOPMENT ON PORTION 2 OF THE FARM MATJES KLOOF 110, REMAINDER OF PORTION 2, PORTION 4 AND THE REMAINDER OF THE FARM MATJES VALJE 103 AND ANNEX WATERVAL 102, NEAR BEAUFORT WEST, WESTERN CAPE.

DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED MULILO KAROO WIND POWER DEVELOPMENT ON PORTION 2 OF THE FARM MATJES KLOOF 110, REMAINDER OF PORTION 2, PORTION 4 AND THE REMAINDER OF THE FARM MATJES VALJE 103 AND ANNEX WATERVAL 102, NEAR BEAUFORT WEST, WESTERN CAPE.

PLEASE NOTE: The Draft Basic Assessment Report for the above-mentioned project is available for a 30-Day review and commenting period from 2 August 2024 – 3 September 2024. Kindly forward your written comments to Madeleine Knoetze at email: madeleine@sescc.net; fax: 086 575 2869; or postal address: P.O. Box 443, Milnerton, 7435 on or before 3 September 2024.

NEEM ASSEBLIEF KENNIS: Die Basiese Assesseringverslag van die bogenoemde projek is beskikbaar vir ‘n 30-dae resensie- en kommentaarlewerings periode, vanaf 2 Augustus 2024 – 3 September 2024. Stuur asseblief u geskrewe kommentare deur na Madeleine Knoetze deur middel van ‘n epos: madeleine@sescc.net; faks: 086 575 2869; of posadres: Posbus 443, Milnerton, 7435 op, of voor 3 September 2024.

Alternatively, comments can be submitted through following the following links/Alternatiewelik kan kommentaar op die voorgestelde projek deur middel van die volgende skakels ingedien word:

  • English commenting and survey form
  • Afrikaanse kommentaarlewerings en opname vorm
  • Kindly see the link to the posters compiled for the Public Open Day held on the 6th of August 2024 here: Public open day posters

    Main Report

    Draft Basic Assessment Report

    Appendices

    Annexure A – Locality Maps and coordinates
    Annexure B – Base map of proposed infrastructure
    Annexure C – Proposed Development Site Layout plan
    Annexure D – Biodiversity Maps
    Annexure E – Site Sensitivity Overlay maps
    Appendix F1 – Interested and Affected Parties Database_public
    Appendix F2 – Pre-Application Public Participation undertaken
    Annexure G – Site Photographs
    Annexure H – Technical Information and SWMP
    Appendix I1 – Agricultural Assessment
    Appendix I2 – Visual Impact Assessment
    Appendix I3 – Heritage Impact Assessment_Phase 1
    Appendix I4 – Terrestrial Biodiversity Impact Assessment
    Appendix I5 – Bats Impact Assessment
    Appendix I6 – Avifaunal Impact Assessment
    Appendix I7 – Palaeontological Impact Assessment
    Appendix I8 – Aquatic Biodiversity Impact Assessment
    Appendix I9 – Defense Compliance Statement
    Appendix I10 – Civil Aviation Compliance Statement
    Appendix I11 – RFI Assessment
    Appendix I12 – Noise Impact Assessment
    Appendix I13 – Traffic Impact Assessment
    Appendix I14 – Geotechnical Desktop Assessment
    Appendix I15 – Socio-Economic Impact Assessment
    Appendix J1 – Site Specific Environmental Management Programme
    Appendix J2 – Generic EMPr – IPP Substation_MKWP_250724
    Appendix K1 – Declaration of Independence EAP and Specialists
    Appendix K2 – Curriculum Vitae of the EAPs