Latest News

Facebook

Facebook Pagelike Widget

DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADE OF THE EXISTING EDEN SEWAGE PUMP STATION, ON ERVEN RE/5987, 6013 AND 6014, GEORGE, WESTERN CAPE

DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADE OF THE EXISTING EDEN SEWAGE PUMP STATION, ON ERVEN RE/5987, 6013 AND 6014, GEORGE, WESTERN CAPE

DEA&DP REF.NO.: 16/3/3/1/D2/17/0008/23

PLEASE NOTE: The Draft Basic Assessment Report for the above-mentioned project is now available for a 30-Day review and commenting period until 12 June 2023. Kindly forward your written comment to Michael Bennett at email: michael@sescc.net; fax: 086 575 2869; or postal address: P.O. Box 9087, George, 6530 on or before 12 June 2023.

Download all files: BAR – Eden Pumpstation – 8 May 2023

BAR – Eden Pumpstation – 8 May 2023

Appendix A1 – Locality Maps

Appendix C – Photographs

Appendix D – Biodiversity Overlay Map

Appendix G1 – FreshwaterAssessment_Feb2023_Final

Appendix G2 – Geohydrological Report

Appendix H – Draft – EMPr – 8 May 2023

Appendix I – STR – SVR – Comment

Appendix L – Engineering Concept and Viability Report