SES REF: 12/HART/DEIAR/10/2024
DFFE REF: 14/12/16/3/3/2/2564
PLEASE NOTE: The Draft Environmental Impact Assessment Report for the above-mentioned project is available for a 30-Day review and commenting period from 18 October 2024 – 18 November 2024. Kindly forward your written comments to Madeleine Knoetze at email: madeleine@sescc.net; fax: 086 575 2869; or postal address: P.O. Box 443, Milnerton, 7435 on or before 18 November 2024.
NEEM ASSEBLIEF KENNIS: Die Konsep Omgewingsimpak Assesseringsverslag van die bogenoemde projek is beskikbaar vir ‘n 30-dae resensie- en kommentaarlewerings periode, vanaf 18 Oktober 2024 – 18 November 2024. Stuur asseblief u geskrewe kommentare deur na Madeleine Knoetze deur middel van ‘n epos: madeleine@sescc.net; faks: 086 575 2869; of posadres: Posbus 443, Milnerton, 7435 op, of voor 18 November 2024.
Draft Environmental Impact Assessment Report – Hartebeest Hoek Solar
Appendix A1 – Locality Map_1_50000
Appendix A2 – Locality Map – 1_25000
Appendix B1 – Basemap of existing infrastructure – Hartebeest
Appendix B2 – Similar Projects within the 30 km Radius
Appendix C1 – Preferred Proposed Site Development Plan
Appendix C2 – Alternative 1 site development plan
Appendix C3 – Alternative 2 site development plan
Appendix D1 – Terrestrial Biodiversity, plant and animal sensitivities
Appendix D2 – Palaeontological Sensitivities
Appendix D3 – Visual Sensitivities
Appendix D4 – Aquatic Biodiversity Sensitivities
Appendix D5 – Archaeological Sensitivities
Appendix D6 – Avifaunal Sensitivities
Appendix D7 – Critical Biodiversity Areas Map
Appendix D8_National Freshwater Ecosystem Priority Areas Map
Appendix D9 – Ecosystem Threat Status Map
Appendix D10 – Screening Tool Report
Appendix D11 – Overall Sensitivities Map
Appendix E1 – Proof of Site notices and Newspaper Adverts
Appendix E2 – Comments and Responses Report_Scoping
Appendix E3 – Due to the POPIA – Only distributed to the Competent Authority
Appendix E4 – Proof of Public Participation of Scoping
Appendix E5 – Interested and Affected Parties Register – Redacted
Appendix F – Site Photographs
Appendix G1 – Schematic Engineering Designs
Appendix G2a – Stormwater Management Plan
Appendix G2b – Erosion Management Plan
Appendix H1 – Terrestrial Biodiversity Impact Assessment Report – Hartebeest HoekSolar PV1
Appendix H2 – Aquatic Biodiversity Impact Assessment
Appendix H3 – Visual Impact Assessment Report
Appendix H4 – Socio-Economic Impact Assessment
Appendix H5 – Heritage Impact Assessment
Appendix H6 – Palaeontological Phase 1 Assessment
Appendix H7 – Agricultural Compliance Statement
Appendix H8 – Avifuanal Impact Assessment
Appendix I1 – Site Specific Environmental Management Programme
Appendix I2 – Generic Environmental Management Programme – IPP Substation
Appendix J1 – Cirriculum Vitaes – EAPs and Specialists
Appendix J2 – Declaration of the EAP and Specialists
Appendix J3 – Registrations of EAP and specialists
Appendix K – SSVR -Hartebeest Hoek PV1
Appendix L1 – Acknowledgement of receipt_Application and DSR
Appendix L2 – Comments on the Draft SR
Appendix L3 – Acknowledgement of Receipt of Final SR
Appendix L4 – Acceptance of the Final SR
Appendix L5 – Confirmation of final submission date of EIAR