Latest News

Facebook

Facebook Pagelike Widget

NOTICE OF 30-DAY PUBLIC PARTICIPATION COMMENTING PERIOD FOR THE POST-APPLICATION DRAFT SCOPING REPORT FOR THE PROPOSED CONSTRUCTION OF THE GREENVALLEY MIXED-USE DEVELOPMENT ON PORTIONS 28, 31 AND 32 OF FARM WITTEDRIFT NO 306, PLETTENBERG BAY, BITOU LOCAL MUNICIPALITY.

NOTICE OF 30-DAY PUBLIC PARTICIPATION COMMENTING PERIOD FOR THE POST-APPLICATION DRAFT SCOPING REPORT FOR THE PROPOSED CONSTRUCTION OF THE GREENVALLEY MIXED-USE DEVELOPMENT ON PORTIONS 28, 31 AND 32 OF FARM WITTEDRIFT NO 306, PLETTENBERG BAY, BITOU LOCAL MUNICIPALITY.

Plettenberg Bay, Western Cape.

SES REF: 10/POSTAPP/DSR/GREENVALLEY/01/2023

DEA&DP REF: 16/3/3/6/1/D1/7/0076/21

Please note that the Post-Application Draft Scoping Report for the above-mentioned project will be made available for a 30-Day review and commenting period running from 23 January 2023 until 22 February 2023. Kindly forward your written comment to Betsy Ditcham at email: betsy@sescc.net; fax: 086 575 2869; or postal address: P.O. Box 443, Milnerton, 7435 on or before 22 February 2023. Alternatively, comments can be provided through the following links:

NOTICE OF PUBLIC OPEN DAY / KENNISGEWING VAN PUBLIEKE OPEDAG

GREENVALLEY MIXED-USE DEVELOPMENT / GREEN VALLEY GEMENGDE LANDSVERBRUIK ONTWIKKELING

On behalf of the Bitou Local Municipality, SES hereby invites all Interested and Affected Parties to a Public Open Day for the Green Valley Mixed-Use Project. Please note that the public open day will be held on Thursday, 26 January 2023 between 16:00 and 18:00 at the Green Valley Community Hall.

 Should you wish to pre-register, please follow the link below. Kindly note that the pre-registration period closes on the 24th of January 2023 at 12:00.

REGISTRATION FORM

I&AP information will be managed in-line with the Protection of Personal Information Act 2013 (“POPI”Act), therefore by registering as an I&AP and commenting, please note that your personal information can be made available.

Public Documents

Post-Application Draft Scoping Report_012023

Annexure A_Topocadastral Location Map of Mixed Use Development Site

Annexure B_Satellite Location Map of Mixed Use Development & Bulk Infrastructu

Appendix C1_Site Layout Plan Mixed Use Development

Appendix C2_Conceptual Bulk Sewage Infrastructure Layout

Appendix C3_Conceptual Bulk Water Infrastructure Layout

Appendix D1_Critical Biodiversity & Ecological Support Areas Map

Appendix D2_Site Sensitivity Verification Report and Screening Tool Results

Appendix E1_Register of I&APs 2023

Appendix E2_Site Notices

Appendix E3_Newspaper Advertisement

Appendix E4_Comments and Reponse Table_PreApplication Phase

Appendix E7_Agreed Public Participation Plan

Annexure F_Photographs

Appendix G1_Preliminary Engineering Report

Appendix G2_Town Planning Report

Appendix G3_GLS Services Capacity Analysis Report

Appendix G4_Electrical Services Report

Appendix G5_Traffic Impact Assessment

Appendix G6_Proposed Stormwater Management

Appendix H1_Socio-Economic Baseline Report

Appendix H2_Botanical Impact Assessment

Appendix H3_Freshwater Impact Assessment

Appendix I_Plan of Study for EIA_Dec 2022

Annexure J_CV Betsy Ditcham

Annexure K_Declarations