George, Western Cape.
SES REF: 21/GRD/DEIAR/02/2022/
DEA&DP REF: 16/3/3/2/D2/19/0000/22
Kindly Note: The Draft Environmental Impact Assessment Report for the above-mentioned project is now available for a 30-Day review and commenting period until 11 March 2022. Kindly forward your written comment to Betsy Ditcham at email: betsy@sescc.net; fax: 086 575 2869; or postal address: P.O. Box 443, Milnerton, 7435 on or before 11 March 2022.
Garden Route Dam_Draft EIA Report_Final
ASSOCIATED FILES:
- ANNEXURE A LOCATION MAP
- ANNEXURE B BASE PLAN OF EXISTING INFRASTRUCTURE
- APPENDIX C1 THE PREFERRED SITE LAYOUT PLAN
- APPENDIX C2 ALTERNATIVE LAYOUT PLAN
- APPENDIX C3 PROPOSED WATER RETICULATION PLAN
- APPENDIX C4 PROPOSED SEWER RETICULATION PLAN
- APPENDIX C5 PROPOSED ROADS AND STORMWATER PLAN
- APPENDIX D1 BOTANICAL SENSITIVITIES MAP
- APPENDIX D2 CRITICAL BIODIVERSITY AREA MAP
- APPENDIX D3 NATIONAL FRESHWATER ECOSYSTEM PRIORITY AREAS MAP
- APPENDIX D4 ECOSYSTEM STATUS MAP
- APPENDIX D5 DEA SCREENING TOOL RESULTS
- APPENDIX E2 ADVERTISEMENT & SITE NOTICE
- APPENDIX E3 COMMENTS AND RESPONSES REPORT PRE APPLICATION
- APPENDIX E4 COMMENTS AND RESPONSES TABLE – POST-APPLICATION CONSULTATION
- ANNEXURE F SITE PHOTOGRAPHS
- APPENDIX G1 TOWN PLANNING MOTIVATION
- APPENDIX G2 CIVIL ENGINEERING AND SERVICES ASSESSMENT
- APPENDIX G3 STORMWATER MANAGEMENT PLAN
- APPENDIX G4 URBAN DESIGN REPORT
- APPENDIX G5 TRAFFIC IMPACT ASSESSMENT
- APPENDIX H1 BIODIVERSITY IMPACT ASSESSMENT
- APPENDIX H2 AQUATIC IMPACT ASSESSMENT
- APPENDIX H3 BUTTERFLY SURVEY
- APPENDIX H4 VISUAL IMPACT ASSESSMENT REPORT
- APPENDIX H5 SOCIO-ECONOMIC IMPACT ASSESSMENT REPORT
- APPENDIX H6 CORRESPONDENCE FROM HWC
- APPENDIX H7 AGRICULTURAL COMPLIANCE STATEMENT
- ANNEXURE I ENVIRONMENTAL MANAGEMENT PROGRAMME
- ANNEXURE J CURRICULUM VITAE OF THE EAP & DECLARATION