Wittedrift, Western Cape Province.
SES REF: 8/BAR/PLT/H/6/20
DEA&DP REF: N/A
PLEASE NOTE: The draft Basic Assessment Report for the above-mentioned project is available for a 30-Day review and commenting period between 03 July 2020 until 17 August 2020. Kindly forward your written comment to Ameesha Sanker at email: ameesha@sescc.net; fax: 086 575 2869; or postal address: P.O. Box 443, Milnerton, 7435 on or before 17 August 2020.
ASSOCIATED FILES:
Wittedrift Draft Basic Assessment Report
APPENDICES
- APPENDIX A.1 LOCALITY MAP
- APPENDIX A.3.1 PROPOSED WATER RETICULATION
- APPENDIX A.3.1.1 WATER RETICULATION COORDINATES
- APPENDIX A.3.2 PROPOSED SEWER NETWORK
- APPENDIX A.3.2.1 PROPOSED SEWER NETWORK COORDINATES
- APPENDIX B.1.1 PREFERRED ALTERNATIVE 1 LAYOUT
- APPENDIX B.1.2 ALTERNATIVE 2 LAYOUT
- APPENDIX B.2 MAP WITH BUFFER
- APPENDIX C SITE PHOTOS
- APPENDIX D BIODIVERSITY MAP
- APPENDIX E20.1 HERITAGE TOR
- APPENDIX E20.2 CIVIL ENGINEERING TOR
- APPENDIX E20.3 ELECTRICAL ENGINEERING TOR
- APPENDIX E.21 MOTIVATION FOR REZONING APPLICATION
- APPENDIX E.23 NOI DEA&DP RESPONSE
- APPENDIX E.24 S38 NID RESPONSE
- APPENDIX F.1 I&AP REGISTER
- APPENDIX F.2 PUBLIC PARTICIPATION PLAN
- APPENDIX F.3 ON SITE NOTICE
- APPENDIX F.4 NEWSPAPER ADVERT
- APPENDIX F.5 BACKGROUND INFORMATION DOCUMENT
- APPENDIX G.1 FRESHWATER HABITAT ASSESSMENT REPORT
- APPENDIX G.2 HERITAGE BASELINE STUDY
- APPENDIX H ENVIRONMENTAL MANAGEMENT PLAN REPORT
- APPENDIX I.1 SCREENING TOOL (19_10_2019)
- APPENDIX I.2 SCREENING TOOL (23_06_2020)
- APPENDIX L.1 PRELIMINARY DESIGN REPORT
- APPENDIX L.2 PRELIMINARY DESIGN DRAWINGS