Beaufort West, Western Cape Province
SES REF: 22/BW Cemetery/06/2020
DEA&DP REF: 16/3/3/6/7/1/C3/1/0095/20
PLEASE NOTE: The revised draft Basic Assessment Report for the above-mentioned project is available for a 30-Day review and commenting period between 20 November 2020 until 11 January 2021. Kindly forward your written comment to Ameesha Sanker at email: ameesha@sescc.net; fax: 086 575 2869; or postal address: P.O. Box 443, Milnerton, 7435 on or before 11 January 2021.
ASSOCIATED FILES:
Revised Draft BAR Expansion of Goue Akker Cemetery, Beaufort West
APPENDICES
- Appendix A.1 Locality Map
- Appendix B.1.1. Preferred Alternative 1 Layout
- Appendix B.1.2. Alternative 2 Layout
- Appendix B.2 Layout plan
- Appendix C Site Photographs
- Appendix D Biodiversity Map Appendix E.1 Section 38(8) Response to NID
- Appendix E.2 Comment from CapeNature on DBAR
- Appendix E.3 Comment from BGCMA on DBAR
- Appendix E.16 Municipal Confirmation of Water and Sanitation services
- Appendix E.17 Comment from District Municipality on DBAR
- Appendix E.20 TOR Beaufort West Cemetery Freshwater Assessment
- Appendix E.21 Landuse Rezoning Certificate
- Appendix E.23 GA Confirmation letter BGCMA Beaufort West Cemetery
- Appendix E.24 DEADP Comment on DBAR
- Appendix F.1.1 Original Public Participation Plan
- Appendix F.1.2 Revised Public Participation Plan
- Appendix F.2 IAP Register
- Appendix F.3 Proof of Site Notices
- Appendix F.4 Proof of Advert – Draft BAR
- Appendix G.1 Botanical Assessment Beaufort West cemetery
- Appendix G.2 Freshwater Habitat Assessment Proposed Beaufort West Cemetery
- Appendix G.3 GEOSS Report
- Appendix G.4 Draft HIA
- Appendix H EMPr
- Appendix I.1 Screening Report
- Appendix L.1 Engineering Services Report
- Appendix L.2 28m Buffer Coordinate Table