Get Adobe Flash player

POST APPLICATION DRAFT SCOPING REPORT_Proposed Mixed-Use Development on Portion 9 of the Farm Kranshoek No. 432, Knysna Road, Plettenberg Bay.

SES REF:CT06/38

DEADP REF: 16/3/3/6/7/D1/8/0095/19

PLEASE NOTE: The Post-Applicaiton draft Scoping Report for the above-mentioned project is now available for a 30-Day review and commenting period until  29 November 2019Kindly forward your written comment to Betsy Ditcham at email: betsy@sescc.net; fax: 086 575 2869; or postal address: P.O. Box 443, Milnerton, 7435 on or before 29 November 2019.

Associated Files:

Post-App Draft Scoping Report
ANNEXURE A LOCATION MAP
ANNEXURE B BASE PLAN OF EXISTING INFRASTRUCTURE
APPENDIX C1 THE PREFERRED SITE LAYOUT PLAN
APPENDIX C2 PREVIOUS LAYOUT PLANS
APPENDIX D1 BOTANICAL SENSITIVITY MAP
APPENDIX D2 CRITICAL BIODIVERSITY AREA MAP
APPENDIX D3 NATIONAL FRESHWATER ECOSYSTEM PRIORITY AREAS MAP
APPENDIX D4 ECOSYSTEM STATUS MAP
APPENDIX E1 REGISTER OF POTENTIAL AND REGISTERED IAPS
APPENDIX D3 NATIONAL FRESHWATER ECOSYSTEM PRIORITY AREAS MAP
APPENDIX D4 ECOSYSTEM STATUS MAP
APPENDIX E1 REGISTER OF POTENTIAL AND REGISTERED I AND APs
APPENDIX E2 LAND OWNER CONSENT
APPENDIX E3 SITE NOTICE & PROOF OF LETTER DROP
APPENDIX E4 NEWSPAPER ADVERT AND PROOF
APPENDIX E5 COMMENTS AND RESPONSES TABLE PREAPP
APPENDIX E6 ALL COMMENTS RECEIVED DURING PREAPPLICATION CONSULTATION
APPENDIX F SITE PHOTOGRAPHS
APPENDIX G1 TOWN PLANNING MOTIVATION
APPENDIX G2 CIVIL ENGINEERING AND SERVICES ASSESSMENT.T
APPENDIX H1 RESIDENTIAL MARKET ASSESSMENT
APPENDIX H2 ECOLOGICAL IMPACT ASSESSMENT WITH ADDENDUM
APPENDIX H3 FRESHWATER IMPACT ASSESSMENT WITH ADDENDUM
APPENDIX H4 TRAFFIC IMPACT ASSESSMENT
APPENDIX I PLAN OF STUDY FOR EIA
Previous