Get Adobe Flash player
Projects

Projects currently underway:

  • Aquatic Habitat Impact Assessment: The Expansion of the Commissioner’s Pan Salt Mine
  • Freshwater Habitat Impact Assessment for the Expansion of Outeniqua Eye Clinic Parking Area.

  • Aquatic Habitat Impact Assessment: The Expansion of the Yzerfontein Salt Pan Gypsum Mine

  • EIA for the proposed Nature's Path Eco Lifestyle Village, Keurboomstrand.
  • EIA for the proposed subdivision and rezoning on Erf 256, Plettenberg Bay.
  • EIA for the George composting and builders' waste recycling facility.
  • EIA for the Southern Arterial, George.
  • EIA for the Extension of the Southern Arterial, George.
  • EIA for the proposed upgrade of the Charlesford and Eastford pumpstaions and associated rising mains, Knysna.
  • S24G Application for the construction of an emergency rock revetment on Erf 10190, Milkwood Manor, Plettenberg Bay.
  • S24G Application for the construction of retention walls, open yard, paved driveway and raised terrace on Erf 293, Plettenberg Bay.
  • EIA for the proposed construction of a boma and deck on Erf 10190, Milkwood Manor, Plettenberg Bay.
  • EIA for the proposed sub-division of portion 79 of the Farm Kraaibosch 195, George.
  • EIA for the proposed Bus Depot on a portion of Erf 464, George.
  • EIA for the proposed Victoria Bay Estates on portion 366 of the Farm Kraaibosch 195, George.
  • Environmental Monitoring for Upgrade of Outeniqua Wastewater Treatment Works - Ultra filtration plant, George.
  • Environmental Monitoring for Flood remedial work along the R339 near Uniondale.
  • Environmental Monitoring for Upgrade of stormwater and gravel streets in Haarlem.
  • Environmental Monitoring for Upgrade of stormwater at the Hartenbos Railway station and surrounding areas, Hartenbos.
  • Environmental Monitoring for Haarlem Dam Spillway erosion repair work, Haarlem.
  • Environmental Monitoring for Upgrade of Stream D (stormwater) in Uniondale.
  • EIA and Waste License application for the Upgrade of the Gwaing wastewater treatment works, George.
  • Proposed Hartenbosch Lifestyle Village, Hartenbos.
  • S24G application for the Knysna Reverse Osmosis plant, Knysna.

Recently completed projects include:

  • EIA for Welgevonden Residential Development on Portions 9, 14, 37, 51, 52, 72, 76, 82, 83 & 84 of the Farm Onverwacht No. 143, Oudtshoorn.
  • EIA for Henra Light Industrial Park on Portion 102 of the Farm Hartenbosch No. 217, Mossel Bay – Authorized.
  • EIA for Hartenbos River Park Retirement Village on Portion 36 of the Farm Hartenbosch No. 217, Hartenbos – Authorized.
  • EIA for Mossel Bay Harbour Activity Hub – Authorized.
  • EIA for the Eagles Creek residential development on Portion 187 & 188 and the remainder of Portion 47 of the Farm Vyf Brakkefontein No. 220, Mossel Bay – Authorized.
  • EIA for stormwater network upgrade at the Hartenbos Station & widening of Louis Fourie Avenue, Mossel Bay – Authorized.
  • EIA for a residential estate on Portions 54 & 55 of the Farm Kraaibosch No. 195, George – Authorized.
  • EIA for the Kraaibosch Roads Master Plan – Authorized.
  • EIA for the Hartenbos Landgoed Phase II residential estate, Hartenbos – Authorized.
  • EIA for a water main as part of the Kraaibosch bulk water supply phase III – Authorized.
  • EIA for proposed flood damage remedial work along the Kat River – Authorized
  • EIA for a residential estate on Portion 53 of the Farm Kraaibosch No. 195, George – Authorized.
  • Re-commisioning of the Kaaimans Weir Pump Station, George – Authorised.
  • EIA for the upgrade of the Outeniqua WWTW – Authorized.
  • Environmental Monitoring for Beach Parking Protection, Little Brak.
  • Environmental Monitoring for Drilling for Boreholes, Knysna.
  • Environmental Monitoring for Equipping of Knysna Boreholes.
  • Environmental Monitoring for Drilling for Boreholes, Mossel Bay.
  • Environmental Monitoring for Drilling for Boreholes, George.
  • Environmental Monitoring for Supply and installation of mechanical and electrical pumping equipment for the George Boreholes: Phase I.
  • Environmental Monitoring for Reverse Osmosis Plant in Knysna.
  • Environmental Monitoring for Upgrade of gravel streets in Haarlem.
  • Environmental Monitoring for Outeniqua Treated Effluent Pump station and Pipeline, George.
  • Environmental Monitoring for Proefplaas Substation: Phase 1: Supply and installation of 66kV and ancillary equipment, George.
  • Environmental Monitoring for Schaapkop 132/66 kV Substation, George.
  • EIA for the proposed upgrading of Kusweg in Tergniet, Rheebok, Mosselbay. -- Authorized.
  • EIA for the proposed upgrading of the dutch ovens on Erf 2675, George. – Authorized.