Projects
Aquatic Habitat Impact Assessment for ACSA Port Elizabeth Airport Photovoltaic (Pv) Plant, Eastern Cape
Aquatic Habitat Impact Assessment for Activities for Flood and Stormwater Management Upgrades in the Suburb of Poortjies, Plettenberg Bay
Aquatic Habitat Impact Assessment for Construction oaf A 22kv Overhead Powerline, near Humansdorp, Eastern Cape
Aquatic Habitat Impact Assessment for development of Herold’s Bay Country Estate on A Portion of Portion 7 Of Farm Buffelsfontein No. 204, Herold’s Bay
Aquatic Habitat Impact Assessment for Development of the remainder of Erf 464, adjacent to the Garden Route Dam, George
Aquatic Habitat Impact Assessment for Divisional Road 1843 causeway upgrades
Aquatic Habitat Impact Assessment for Gemsbok Horn salt pan mine prospecting
Aquatic Habitat Impact Assessment for Gran Sasso Quarry water abstraction and road crossing a watercourse, Tygervalley, Cape Town
Aquatic Habitat Impact Assessment for Groot Witpan and Konga Pan salt mining, Northern Cape
Aquatic Habitat Impact Assessment for Hartenbos Estuary Habitat Integrity Assessment with Fish Survey and water quality analysis
Aquatic Habitat Impact Assessment for Heidevallei Subsidised Housing Development (status quo), Knysna
Aquatic Habitat Impact Assessment for Installation of sewer and water pipelines along the N2 National Road, Cape Town
Aquatic Habitat Impact Assessment for Maintenance of Trunk Road 33/4 and Trunk Road 34/2, though Meiringspoort, Western Cape Province
Aquatic Habitat Impact Assessment for Proposed Waste Water Treatment Works, Irrigation Activities & Effluent Discharge by Parmalat SA (Pty) Ltd, Bonnievale
Aquatic Habitat Impact Assessment for Residential Development on Portion 88 of Kraaibosch 195, George
Aquatic Habitat Impact Assessment for Seven Oaks Residential Development, Witterdrift, Plettenberg Bay
Aquatic Habitat Impact Assessment for the construction of Green Valley residential subsidised housing development
Aquatic Habitat Impact Assessment for the D1252 Road Upgrade, Imbabazane Local Municipality
Aquatic Habitat Impact Assessment for the Ecovate Waste to Energy Project, eThekwini Metropolitan Municipality
Aquatic Habitat Impact Assessment for the expansion of the Commissioner’s Pan salt mine, Northern Cape
Aquatic Habitat Impact Assessment for the expansion of the Yzerfontein Salt Pan gypsum mine
Aquatic Habitat Impact Assessment for the George Water Treatment Works new rising main bulk water pipeline
Aquatic Habitat Impact Assessment for the Kranshoek Bulk Water Supply Scheme, near Plettenberg Bay
Aquatic Habitat Impact Assessment for the Mpambanyoni River Vehicle Bridge
Aquatic Habitat Impact Assessment for the Nature’s Valley Bulk Water Pipeline Supply System
Aquatic Habitat Impact Assessment for the Ogle Farm Housing Development
Aquatic Habitat Impact Assessment for the P73 Provincial Road Upgrade
Aquatic Habitat Impact Assessment for the P77 Provincial Road Upgrade, Vulamehlo Local Municipality
Aquatic Habitat Impact Assessment for the proposed Aalwyndal Precinct Plan Development: Biodiversity Component
Aquatic Habitat Impact Assessment for the proposed Aalwyndal Precinct Plan Development: Freshwater Specialist Component
Aquatic Habitat Impact Assessment for the proposed Frischgewaagd Water Treatment Works, Pongola River
Aquatic Habitat Impact Assessment for the proposed Gouritz Sand Mine, Gouritzmond
Aquatic Habitat Impact Assessment for the proposed P96 Road Upgrade
Aquatic Habitat Impact Assessment for the proposed pedestrian bridge over a tributary of the Groot Brak River
Aquatic Habitat Impact Assessment for the Replacement of Bridge and Culvert Structures on Dr1218, Dr1252 and Op4032, near Stanford
Aquatic Habitat Impact Assessment for the Theewaterskloof Municipal Spatial Development Framework: Botrivier Freshwater Assessment (Site 1)
Aquatic Habitat Impact Assessment for the Theewaterskloof Municipal Spatial Development Framework: Caledon Freshwater Assessment(Sites 9 – 11)
Aquatic Habitat Impact Assessment for the Theewaterskloof Municipal Spatial Development Framework: Grabouw Freshwater Assessment (Site 4 – 8)
Aquatic Habitat Impact Assessment for the Theewaterskloof Municipal Spatial Development Framework: Villiersdorp freshwater Assessment (Sites 2 & 3)
Aquatic Habitat Impact Assessment for Tweekuilen Estuary Habitat Integrity Assessment with Fish Survey
Aquatic Habitat Impact Assessment for Upgrading of the New Barker’s and Meshlyn Bridges
Aquatic Habitat Impact Assessment for Widening of The Maalgate River Bridge (No. 2221 at Km 15.1 on Trunk Road 2 Section 9), near the George Airport
Aquatic Habitat Impact Assessment forResidential Development on Portion 3 of Kraaibosch 195, George
Aquatic Habitat Impact Assessment: The Expansion of the Commissioner’s Pan Salt Mine
Aquatic Habitat Impact Assessment: The Expansion of the Yzerfontein Salt Pan Gypsum Mine
Basic Assessment and Waste Management Licence for the proposed Pilot Deploymerisation Processing Plant in Mossel Bay
EIA and Environmental Authorisation Amendment processes for the Proposed Mixed-Use Housing Developments at Symphony Way
EIA and Waste License application for the Upgrade of the Gwaing wastewater treatment works, George.
EIA for a residential estate on Portion 53 of the Farm Kraaibosch No. 195, George
EIA for a residential estate on Portions 54 & 55 of the Farm Kraaibosch No. 195, George
EIA for a water main as part of the Kraaibosch bulk water supply phase III
EIA for Hartenbos River Park Retirement Village on Portion 36 of the Farm Hartenbosch No. 217, Hartenbos
EIA for Henra Light Industrial Park on Portion 102 of the Farm Hartenbosch No. 217, Mossel Bay
EIA for Mossel Bay Harbour Activity Hub
EIA for proposed flood damage remedial work along the Kat River
EIA for stormwater network upgrade at the Hartenbos Station & widening of Louis Fourie Avenue, Mossel Bay
EIA for the Eagles Creek residential development on Portion 187 & 188 and the remainder of Portion 47 of the Farm Vyf Brakkefontein No. 220, Mossel Bay
EIA for the Extension of the Southern Arterial, George.
EIA for the George composting and builders’ waste recycling facility.
EIA for the Hartenbos Landgoed Phase II residential estate, Hartenbos
EIA for the Kraaibosch Roads Master Plan
EIA for the proposed Bus Depot on a portion of Erf 464, George.
EIA for the proposed construction of a boma and deck on Erf 10190, Milkwood Manor, Plettenberg Bay.
EIA for the proposed Kwanokuthula Phase 5 & 6 Mixed Use Development & Associated Bulk Infrastructure
EIA for the Proposed Mixed-Use Development on Portion 9 of the Farm Kranshoek No. 432, Knysna Road, Plettenberg Bay
EIA for the proposed Nature’s Path Eco Lifestyle Village, Keurboomstrand.
EIA for the proposed New Horizons Mixed-Use Development on Farm Hillview No. 437 & Associated Infrastructure
EIA for the proposed subdivision and rezoning on Erf 256, Plettenberg Bay.
EIA for the proposed sub-division of portion 79 of the Farm Kraaibosch 195, George.
EIA for the proposed Upgrade and Improvement of the existing Stormwater System in Poortjies, Plettenberg Bay
EIA for the proposed upgrade of the Charlesford and Eastford pumpstaions and associated rising mains, Knysna.
EIA for the proposed upgrading of Kusweg in Tergniet, Rheebok, Mosselbay.
EIA for the proposed upgrading of the dutch ovens on Erf 2675, George.
EIA for the proposed Victoria Bay Estates on portion 366 of the Farm Kraaibosch 195, George.
EIA for the Southern Arterial, George.
EIA for the upgrade of the Outeniqua WWTW
EIA for Welgevonden Residential Development on Portions 9, 14, 37, 51, 52, 72, 76, 82, 83 & 84 of the Farm Onverwacht No. 143, Oudtshoorn.
Environmental Monitoring for Beach Parking Protection, Little Brak.
Environmental Monitoring for Drilling for Boreholes, George.
Environmental Monitoring for Drilling for Boreholes, Knysna.
Environmental Monitoring for Drilling for Boreholes, Mossel Bay.
Environmental Monitoring for Equipping of Knysna Boreholes.
Environmental Monitoring for Flood remedial work along the R339 near Uniondale.
Environmental Monitoring for Haarlem Dam Spillway erosion repair work, Haarlem.
Environmental Monitoring for Outeniqua Treated Effluent Pump station and Pipeline, George.
Environmental Monitoring for Proefplaas Substation: Phase 1: Supply and installation of 66kV and ancillary equipment, George.
Environmental Monitoring for Reverse Osmosis Plant in Knysna.
Environmental Monitoring for Schaapkop 132/66 kV Substation, George.
Environmental Monitoring for Supply and installation of mechanical and electrical pumping equipment for the George Boreholes: Phase I.
Environmental Monitoring for Upgrade of Outeniqua Wastewater Treatment Works – Ultra filtration plant, George.
Environmental Monitoring for Upgrade of stormwater and gravel streets in Haarlem.
Environmental Monitoring for Upgrade of stormwater at the Hartenbos Railway station and surrounding areas, Hartenbos.
Environmental Monitoring for Upgrade of Stream D (stormwater) in Uniondale.
Environmental Monitoring for Upgrade of gravel streets in Haarlem.
Freshwater habitat assessment for the construction of the Beaufort West water pipeline
Freshwater habitat assessment for the Dambuza Road Upgrade, Edendale.
Freshwater Habitat Impact Assessment for the Expansion of Outeniqua Eye Clinic Parking Area.
Freshwater specialist input to land use assessment for future wetland protection in the upper Cata River catchment, Keiskammahoek, Eastern Cape
Freshwater specialist input to the George Spatial Development Plan (SDF)
Freshwater specialist input to the Theewaterskloof Municipal Spatial Development Framework: Biodiversity Report
Health and ecosystem services assessment of wetlands in the upper Cata River catchment, Keiskammahoek, Eastern Cape
Proposed Hartenbosch Lifestyle Village, Hartenbos.
Re-commisioning of the Kaaimans Weir Pump Station, George – Authorised.
Rehabilitation Plan watercourses impacted by clearance of vegetation on Portion 1 of Farm 94, Waboomskraal
S24G Application for the construction of an emergency rock revetment on Erf 10190, Milkwood Manor, Plettenberg Bay.
S24G Application for the construction of retention walls, open yard, paved driveway and raised terrace on Erf 293, Plettenberg Bay.
S24G application for the Knysna Reverse Osmosis plant, Knysna.
Wetland and River delineation and health assessment for the George Spatial Development Plan (SDF)