Plettenberg Bay, Western Cape.
SES REF: 10/POSTAPP/DSR/GREENVALLEY/01/2023
DEA&DP REF: 16/3/3/6/1/D1/7/0076/21
Please note that the Post-Application Draft Scoping Report for the above-mentioned project will be made available for a 30-Day review and commenting period running from 23 January 2023 until 22 February 2023. Kindly forward your written comment to Betsy Ditcham at email: betsy@sescc.net; fax: 086 575 2869; or postal address: P.O. Box 443, Milnerton, 7435 on or before 22 February 2023. Alternatively, comments can be provided through the following links:
- English: https://forms.gle/PTGvxwGVwDdcLqVz6
- Afrikaans: https://forms.gle/TPX13NMmFxYvSbbr9
NOTICE OF PUBLIC OPEN DAY / KENNISGEWING VAN PUBLIEKE OPEDAG
GREENVALLEY MIXED-USE DEVELOPMENT / GREEN VALLEY GEMENGDE LANDSVERBRUIK ONTWIKKELING
On behalf of the Bitou Local Municipality, SES hereby invites all Interested and Affected Parties to a Public Open Day for the Green Valley Mixed-Use Project. Please note that the public open day will be held on Thursday, 26 January 2023 between 16:00 and 18:00 at the Green Valley Community Hall.
Should you wish to pre-register, please follow the link below. Kindly note that the pre-registration period closes on the 24th of January 2023 at 12:00.
I&AP information will be managed in-line with the Protection of Personal Information Act 2013 (“POPI”Act), therefore by registering as an I&AP and commenting, please note that your personal information can be made available.
Public Documents
Post-Application Draft Scoping Report_012023
Annexure A_Topocadastral Location Map of Mixed Use Development Site
Annexure B_Satellite Location Map of Mixed Use Development & Bulk Infrastructu
Appendix C1_Site Layout Plan Mixed Use Development
Appendix C2_Conceptual Bulk Sewage Infrastructure Layout
Appendix C3_Conceptual Bulk Water Infrastructure Layout
Appendix D1_Critical Biodiversity & Ecological Support Areas Map
Appendix D2_Site Sensitivity Verification Report and Screening Tool Results
Appendix E1_Register of I&APs 2023
Appendix E3_Newspaper Advertisement
Appendix E4_Comments and Reponse Table_PreApplication Phase
Appendix E7_Agreed Public Participation Plan
Appendix G1_Preliminary Engineering Report
Appendix G2_Town Planning Report
Appendix G3_GLS Services Capacity Analysis Report
Appendix G4_Electrical Services Report
Appendix G5_Traffic Impact Assessment
Appendix G6_Proposed Stormwater Management
Appendix H1_Socio-Economic Baseline Report
Appendix H2_Botanical Impact Assessment
Appendix H3_Freshwater Impact Assessment
Appendix I_Plan of Study for EIA_Dec 2022