PLEASE NOTE: The Draft Basic Assessment Report for the above-mentioned project is available for a 30-day review and commenting period ending 27 March 2026.
Kindly forward your written comments to Madeleine Knoetze at email: madeleine@sescc.net on or before the 27th of March 2026.
Please note: In terms of the POPI Act of 2023, by registering as an I&AP and commenting, your name and comment will be made public.
Draft Basic Assessment Report – Hartebeest Hoek – 25 Feb 2026
Appendix A1 – List of Coordinates and mapping
Appendix A3 – Basemap of existing infrastructure – Hartebeest
Appendix A4 – Similar Projects within the 30 km Radius
Appendix B1 – Site Photographs
Appendix B2 – Site Sensitivity Verification Report
Appendix B3A – Screening Tool Report – Preferred Corridor Route
Appendix B3B – Screening Tool Report – Alternative Corridor Route
Appendix B3C – Screening Tool Report – Substation
Appendix C – Typical facility drawings for development type
Appendix D1 – Agricultural Study
Appendix D2 – Aquatic Biodiversity Impact Assessment
Appendix D2a – Aquatic Memorandum
Appendix D3 – Terrestrial Biodiversity Impact Assessment
Appendix D3a – Terrestrial Biodiversity Memorandum
Appendix D4 – Avifaunal Impact Assessment
Appendix D4a – Avifaunal Memorandum
Appendix D5 – Heritage Impact Assessment
Appendix D6 – Palaeontolgy Impact Assessment
Appendix D7 – Social Baseline Report
Appendix D8 – Visual Impact Assessment
Appendix E1 – Stakeholders_Interested and Affected Parties Register-Public
Appendix E2 – Site Notices Placed
Appendix E3 – Newspaper Adverts placed
Appendix G – Generic Environmental Management Programme
Appendix H – Expertise of the EAP
Appendix I – Declarations of the Specialists
Appendix J1 – Confirmation of Competent Authority
Appendix J2 – Environmental Authorisation Hartebeest Hoek Solar PV1 facility











