PRE-APPLICATION BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADING OF THE HEROLD’S BAY SEWAGE PUMP STATION 1 AND ASSOCIATED RISING MAIN AND THE DEVELOPMENT OF NEW ASSOCIATED INFRASTRUCTURE, ON ERF 116, ERF 110, ERF 113, REMAINDER OF ERF 95, REMAINDER OF FARMS 236 AND 237 AND PORTIONS 10, 35 AND 37 OF FARM BRAKFONTEIN NO. 236, HEROLDS BAY, GEORGE MUNICIPALITY, WESTERN CAPE

PRE-APPLICATION BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADING OF THE HEROLD’S BAY SEWAGE PUMP STATION 1 AND ASSOCIATED RISING MAIN AND THE DEVELOPMENT OF NEW ASSOCIATED INFRASTRUCTURE, ON ERF 116, ERF 110, ERF 113, REMAINDER OF ERF 95, REMAINDER OF FARMS 236 AND 237 AND PORTIONS 10, 35 AND 37 OF FARM BRAKFONTEIN NO. 236, HEROLDS BAY, GEORGE MUNICIPALITY, WESTERN CAPE

DEA&DP REF NUMBER: 16/3/3/6/7/1/D2/29/0229/23

PLEASE NOTE: The Pre-Application Basic Assessment Report for the above-mentioned project is available for a 30-day review and commenting period till 18 October 2024. Kindly forward your written comments to Lu-anne Beets at email: luanne@sescc.net, fax: 086 575 2869, or postal address: PO Box 9087, George, 6530 on or before 18 October 2024.

Herold’s Bay Pump Station and Pipeline Pre-App BAR

Appendix A1 – Locality Map

Appendix A2 – Coastal Risk Lines

Appendix A3 – Map with GPS co-ordinates

Appendix B1 – SDP

Appendix C – Site Photos

Appendix D – CBA Map

Appendix E1 – Comment from HWC

Appendix E20 – Specialists ToR’s

Appendix F – I&AP’s

Appendix G1 – Botanical statement

Appendix G2 – Aquatic Assessment

Appendix G3 – Terrestrial Faunal and Avifaunal Impact Assessment Report

Appendix G4 – Groundwater Report

Appendix G5 – Heritage Statement for HWC

Appendix H – EMPr

Appendix I – Screening Tool Report

Appendix L – Draft Design Report