Latest News

Facebook

Facebook Pagelike Widget

REVISED DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADING OF STORMWATER INFRASTRUCTURE IN ROSEMOOR, ON ERVEN 9000, 14079,17362,17328,17327,17362, 4250, 4372, AND REMAINDERS OF ERVERN 464, 8581,8596,8662, 8602,8596, 8651, GEORGE, WESTERN CAPE.

REVISED DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADING OF STORMWATER INFRASTRUCTURE IN ROSEMOOR, ON ERVEN 9000, 14079,17362,17328,17327,17362, 4250, 4372, AND REMAINDERS OF ERVERN 464, 8581,8596,8662, 8602,8596, 8651, GEORGE, WESTERN CAPE.

DEA&DP REF NUMBER:16/3/3/1/D2/47/0013/25

PLEASE NOTE: The Revised Draft Basic Assessment Report for the above-mentioned project is available for a 30-day review and commenting period till 1 December  2025.

Kindly forward your written comments to Michael Bennett at email: michael@sescc.net, fax: 086 575 2869, or postal address: PO Box 9087, George, 6530 on or before the  1st of December  2025.

Please note: In terms of the POPI Act of 2023, by registering as an I&AP and commenting, your name and comment will be made public.

Revised BAR- Rosemoor Stormwater Infrastructure Upgrades

Appendix A1- Locality Map

Appendix B1-Master Plan

Appendix B-Design drawings

Appendix B2- Environmental sensitivites Map

Appendix C-Site Photos

Appendix D-Biodiversity overlay map

Appendix E2- Cape Nature Comments

Appendix E3- GA Registration

Appendix E15-DEADP Comment

Appendix E20- TOR of the specialist studies conducted

Appendix F1- Proof of PP

Appendix F2-I&AP List

Appendix F3- All comments

Appendix F4- Comments and Response Report

Appendix G1-Terrestrial Biodiversity Assessment Report

Appendix G2- Aquatic Impact Assessment report

Appendix H- EMPR

Appendix H2- George municipality invasive alien plant monitoring, control & eradication plan 11 May 2021

Appendix H3- Approved Control Plan

Appendix I – STR

Appendix L- Engineering Concept and Viability Report