DEADP Reference: 16/3/3/6/7/1/D1/14/0099/25
PLEASE NOTE: The Final Basic Assessment Report for the above-mentioned project was submitted on the 20th of January 2026 to DEA&DP for decision-making purposes.
The proposed project is available for viewing below:
Final Basic Assessment Report _ Bitou POP
Appendix A3 – Linear Activity Map
Appendix B1 – Alternative Site Development Plan
Appendix B1 – Bending Schedules Appendix
B1 – Concrete Details Appendix B1 – General Arrangement
Appendix B1 – Longitudinal Sections Appendix
B1 – Reinforcement Details Cellular Structure
Appendix B1 – Reinforcement Details Wing Walls
Appendix B2 – Environmental Sensitivity
Appendix D1 – Western Cape Biodiversity Spatial Plan Map
Appendix D2 – Freshwater Resources Map
Appendix D3 Ecosystem Threat Status Map
Appendix D4 – Site Development with Overlay Sensitivity Map
Appendix D5 – Site Sensitivity Verification Report
Appendix E2 – Cape Nature Appendix
E3 Breede-Olifants Catchment Management
E20 A Animal Species TOR_VaroiusCulverts
E 20 B Aquatic TOR _VariousCulverts
E 20 C Plant Species TOR_VariousCulverts
E 20 D Terrestrial Biodiversity TOR_VariousCulverts
Appendix F_ Public Participation
Appendix G1 A – Aquatic assessment report_Garden Route culverts_
Bitou Appendix G2 B – Bitou_Avifauna Compliance Statemen
t Appendix G 3 C- Plant, Animal and Terrestrial Compliance Statement
Appendix G 4 D – Heritage Statement Bitou Road and Culverts – Final
WU42368_GA Registration Certificate-GR Culverts
WULA WULA_BOCMA Acknowledgement letter
Final Environmenrtal Management Programme – Bitou
Appendix I – Screening Tool Report
Appendix L – Engineering Report and Drawings