DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADE OF THE GWAING WASTEWATER TREATMENT WORKS ON ERF RE/464, GEORGE.
DEADP REF: REF: 16/3/3/6/7/1/D2/19/0141/24
PLEASE NOTE: The Draft Basic Assessment Report for the above-mentioned project is available for a 30-day review and commenting period till 4 March 2026.
Kindly forward your written comments to Michael Bennett at email: michael@sescc.net, fax: 086 575 2869, or postal address: PO Box 9087, George, 6530 on or before the 4th of March 2026.
Please note: In terms of the POPI Act of 2023, by registering as an I&AP and commenting, your name and comment will be made public
Draft Basic Assesment Report- Gwaing WWTW
Appendix D-Biodiversity Overlay Map
Appendix E3- Proof of Application to DWS
Appendix E3- 2016 Gwaing WWTW Licens
e – Appendix E11- Pollution management
Appendix E15- Comment from local Authority
Appendix E20 – ToR Appendix F1-Comments and Response Report – 30 January 2026
Appendix F2-I&AP Register Appendix F3-Proof of PP (2)
Appendix F4- Comments received
Appendix G1 – Terrestrial Animal Species Assessment
Appendix G2 – Botanical & Terrestrial Biodiversity Assessment
Appendix G3-Aquatic assessment_V4_Gwaing BBF_George_202511
Appendix G4- Aquatic assessment_Gwaing WWTW upgrades_V4_202511
Appendix G5 – Groundwater monitoring report
Appendix G6 – Engineering Geological Report
Appendix G7 – Gwaing WWTW Master Plan
Appendix G8 – Gwaing WWTW Concept Design Report Phase A & B
Appendix G9 – GLS Network Capacity Study
Appendix H2 -Operations and Maintenance Manual
Appendix I – Screening Tool Report Appendix
L- Preliminary Stormwater Manangement Plan -Gwaing WWTW
Appendix M-Agriman Quality Statement
Appendix N- Agriman Process Flow
Draft Basic Assesment Report- Gwaing WWTW