Latest News

Facebook

Loading...

DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADE OF THE GWAING WASTEWATER TREATMENT WORKS ON ERF RE/464, GEORGE (DEADP REF: REF: 16/3/3/6/7/1/D2/19/0141/24).

DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADE OF THE GWAING WASTEWATER TREATMENT WORKS ON ERF RE/464, GEORGE (DEADP REF: REF: 16/3/3/6/7/1/D2/19/0141/24).

DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADE OF THE GWAING WASTEWATER TREATMENT WORKS ON ERF RE/464, GEORGE.

DEADP REF: REF: 16/3/3/6/7/1/D2/19/0141/24

PLEASE NOTE: The  Draft Basic Assessment Report for the above-mentioned project is available for a 30-day review and commenting period till 4 March 2026.

Kindly forward your written comments to Michael Bennett at email: michael@sescc.net, fax: 086 575 2869, or postal address: PO Box 9087, George, 6530 on or before the  4th of March 2026.

Please note: In terms of the POPI Act of 2023, by registering as an I&AP and commenting, your name and comment will be made public

Draft Basic Assesment Report- Gwaing WWTW

.Appendix A1-Locality Maps

Appendix B1 – SDP

Appendix C – Photographs

Appendix D-Biodiversity Overlay Map

Appendix E1- NID

Appendix E3- Proof of Application to DWS

Appendix E3- 2016 Gwaing WWTW Licens

e – Appendix E11- Pollution management

Appendix E15- Comment from local Authority

Appendix E20 – ToR Appendix F1-Comments and Response Report – 30 January 2026

Appendix F2-I&AP Register Appendix F3-Proof of PP (2)

Appendix F4- Comments received

Appendix G1 – Terrestrial Animal Species Assessment

Appendix G2 – Botanical & Terrestrial Biodiversity Assessment

Appendix G3-Aquatic assessment_V4_Gwaing BBF_George_202511

Appendix G4- Aquatic assessment_Gwaing WWTW upgrades_V4_202511

Appendix G5 – Groundwater monitoring report

Appendix G6 – Engineering Geological Report

Appendix G7 – Gwaing WWTW Master Plan

Appendix G8 – Gwaing WWTW Concept Design Report Phase A & B

Appendix G9 – GLS Network Capacity Study

Appendix H1-Operational EMPr

Appendix H2 -Operations and Maintenance Manual

Appendix I – Screening Tool Report Appendix

L- Preliminary Stormwater Manangement Plan -Gwaing WWTW

Appendix M-Agriman Quality Statement

Appendix N- Agriman Process Flow

Draft Basic Assesment Report- Gwaing WWTW