DEA&DP REF NUMBER: 16/3/3/6/7/1/D2/19/0141/24
PLEASE NOTE: The Pre-Application Basic Assessment Report for the above-mentioned project is available for a review and commenting period till 27 August 2025. Kindly forward your written comments to Michael Bennett at email: michael@sescc.net, fax: 086 575 2869, or postal address: PO Box 9087, George, 6530 on or before 27 August 2025.
Pre-Application Basic Assessment Report_Gwaing WWTW Upgrades
Appendix G1 – Terrestrial Animal Species Assessment
Appendix G2 – Botanical & Terrestrial Biodiversity Assessment
Appendix G3 – Aquatic Biodiversity Impact Assessment for the BBF
Appendix G4 -Aquatic Biodiversty Impact Assessment for Gwaing WWTW
Appendix G5 – Groundwater monitoring report
Appendix G6 – Engineering Geological Report
Appendix G7 – Gwaing WWTW Master Plan
Appendix G8 – Gwaing WWTW Concept Design Report Phase A & B
Appendix G9 – GLS Network Capacity Study