DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED HARTENBOS WASTEWATER TREATMENT WORKS PV SOLAR PLANT AND BATTERY STORAGE SYSTEMS ON REMAINDER OF PORTION 101 OF THE FARM NO. 217, HARTENBOS, MOSSEL BAY

DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED HARTENBOS WASTEWATER TREATMENT WORKS PV SOLAR PLANT AND BATTERY STORAGE SYSTEMS ON REMAINDER OF PORTION 101 OF THE FARM NO. 217, HARTENBOS, MOSSEL BAY

DEA&DP REF NUMBER: 16/3/3/1/D6/18/0033/23

PLEASE NOTE: The Draft Basic Assessment Report for the above-mentioned project is available for a 30-day review and commenting period from 19 January 2024 – 23 February 2024. Kindly forward your written comments to Michael Bennett at email: michael@sescc.net, fax: 086 575 2869, or postal address: PO Box 9087, George, 6530 on or before 23 February 2024.

 

01 Hartenbos Solar Draft BAR – 18 January 2024

Appendix A1 – Locality Map

Appendix B1 – 2300431-C-001&2

Appendix B2

Appendix C Site Photographs

Appendix D Biodiversity Overlay Map

Appendix E20 Animal Species TOR_Hartenbos PV

Appendix E20 Aquatic TOR _Hartenbos PV

Appendix E20 Plant Species TOR_Hartenbos PV

Appendix E20 Terrestrial Biodiversity TOR_Hartenbos PV

Appendix G1 Hartenbos WWTW solar – Oct 23 Botanical Updated

Appendix G2 Freshwater – Hartenbos_ComplianceStatement_September2023

Appendix G3 TERRESTRIAL FAUNAL AND AVIFAUNAL SPECIES COMPLIANCE STATEMENT REPORT

Appendix G4 FINAL-Heritage Statement for HWC Case TBD – Proposed Hartenbos WWTW PV Solar Plant – RE-101-217 – Mossel Bay – Nilssen

Appendix G5 141223 (rf) Hartenbosch WWTW VIA Rev.1 MALA

Appendix H – EMPr – January 2024

Appendix I PV Hartenbos WWTW—2023-08-21 03-04

Appendix L MBM PV Solar & BESS_Prelim Design (Rev0)_230905