DEA&DP REF.NO.: 16/3/3/1/D2/19/0009/23
PLEASE NOTE: The REVISED Draft Basic Assessment Report for the above-mentioned project is now available for more than 30-Day review and commenting period until 3 October 2023. Kindly forward your written comment to Michael Bennett at email: michael@sescc.net; fax: 086 575 2869; or postal address: P.O. Box 9087, George, 6530 on or before 3 October 2023.
REVISED DBAR – ERF 278&282 Kraaibosch195 – 30 August 2023
Appendix B.1.1_Preferred Alternative Layout_2023
Appendix B.1.2_Alternative Layout 2
Appendix E1_Section 38(8) Response to NID Ptn 278 of Farm 195 Farm Kraaibosch
Appendix E2 – CapeNature Comment
Appendix E15 – Jeanne Muller – George Town Planning Comments
Appendix E20_Proof of Agreement
Appendix E23_Existing Approvals_EA and Appeal
Appendix F2 – Proof of DBAR PPP Notices
Appendix F3 – All comments outside offical PPP
Appendix F4 – Comments and Response Report – PRE – APP BAR
Appendix F4 – Comments and Responses – DRAFT BAR PPP
Appendix F5 – All Comments Draft BAR PPP
Appendix G.1_Aquatic Biodiversity Verification_278&282 Kraaibosch 195
Appendix G.2_Environmental Compliance Statement (Terrestrial Bio_Plant Species)
Appendix G.3_Agricutural Compliance Statement
Appendix G.4 – WULASummaryReport
Appendix H – Draft EMPr 30 August 2023
Appendix I_Screening Tool Report_2023 _2022
Appendix L.1_Engineering Services Report_Ptn278_282_Kraaibosch195
Appendix L.2.1_Traffic Impact Assessment Report_Ptn278_282_Kraaibosch195
Appendix L.2.2_Addendum_Traffic Impact Assessment Report_Ptn278_282_Kraaibosch195_2019