DEA&DP Ref: 16/3/3/2/D1/13/0001/25
PLEASE NOTE: The Draft Scoping Report for the above-mentioned project is available for a 30-day review and commenting period till 17 October 2025. Kindly forward your written comments to Madeleine Knoetze at email: madeleine@sescc.net, or postal address: PO Box 443, Milnerton, 7435on or before 17 October 2025.
Please note: In terms of the POPI Act of 2023, by registering as an I&AP and commenting, your name and comment will be made public.
Draft Scoping Report_16 September 2025
Annexure A1 – 1_50 000 Locality Map
Annexure A2 – 1_10 000 Locality Map
Appendix B – Base plan of area
Annexure C1 – Preferred Layout Alternative
Annexure C2a – Alternative Layout_Option 1
Annexure C2b – Alternative Layout_Option 2
Appendix D1 – Terrestrial specialist findings
Appendix D2 – Western Cape Biodiversity Spatial Plan
Appendix D3 – National Freshwater Databases map
Appendix D4 – National Biodiversity Assessment – Ecosystems
Appendix D5 – Aquatic Biodiversity findings
Appendix D6 – Animal No-Go Map
Appendix D7 – Combined Sensitivity Map
Appendix D8 – Screening Tool Report
Appendix E1 – List of I&APs_redacted
Appendix E2 – Site Notices Placed
Appendix E3 – Newspaper Advertisements Placed
Appendix G1 – Town Planning Motivation Report
Annexure G2 – Civil Engineering – Services Overview Report
Appendix H – Plan of Study Kranshoek 7 and 8_12 September 2025
Appendix I – Cirriculum Vitaes of the EAPs
Appendix J – Declaration of the EAP
Annexure L1 – SSVR_Kranshoek – 3 September 2025
Annexure L2 – Aquatic Biodiversity Site Sensitivity Verification – Extracted
Annexure L3 – Terrestrial Biodiversity and plant species – Site Sensitivity Verification Report
Annexure L4 – Animal Species Site Sensitivity verification
Annexure L5 – Agricutural Site Sensitivity Verification
Annexure L6 – Notice of Intent to Develop_as submitted to HWC
Annexure L7 – Ecosystem Corridor Environmental Management Plan
Annexure M1 – Response to the NOI
Annexure M2 – Confirmation of SALA Requirements
Appendix M3 – Clarification letter regarding on site activities