DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADE OF THE SCHAAPKOP PUMPSTATION RISING MAIN, ON REMAINDER OF ERF 464 AND ERF 13486, GEORGE, WESTERN CAPE

DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADE OF THE SCHAAPKOP PUMPSTATION RISING MAIN, ON REMAINDER OF ERF 464 AND ERF 13486, GEORGE, WESTERN CAPE

DEA&DP REF NUMBER: 16/3/3/1/D2/19/0003/24

PLEASE NOTE: The Draft Basic Assessment Report for the above-mentioned project is available for a 30-day review and commenting period till 15 March 2024. Kindly forward your written comments to Michael Bennett at email: michael@sescc.net, fax: 086 575 2869, or postal address: PO Box 9087, George, 6530 on or before 15 March 2024.

 

Schaapkop Pipeline draft BAR – 17 January 2024

Appendix A1 – Locality Map

Appendix A3 – Pipeline Route GPS points

Appendix B – Layout Plans

Appendix C – Site Photos

Appendix D – Critical Biodiversity Areas Map

Appendix E22 – Ackn+Comment.PP-plan and PP Plan

Appendix G1 – Botanical assessment Schaapkop sewer 2 – Jan 24

Appendix G2 – Aquatic assessment report_Schaapkop Rising Main Sewer Pipeline_V3_2024

Appendix G2.1 – WULA information

Appendix G3 – Terrestrial – updated 17 January 2024

Appendix H – draft EMPr – 17 January 2024

Appendix I – STR—2023-05-17 09-32

Appendix J – Engineering – Proposed Construction Methodology