PLEASE NOTE: The Draft Basic Assessment Report for the above-mentioned project is available for a 30-day review and commenting period till 3rd December 2025.
Kindly forward your written comments to Jessica Gossman at email: jessica@sescc.net, fax: 086 575 2869, or postal address: PO Box 443, Milnerton, 7435 on or before the 3rd of December 2025.
Please note: In terms of the POPI Act of 2023, by registering as an I&AP and commenting, your name and comment will be made public.
Appendix A3 – Linear Activity Map
Appendix B1 – Bending Schedules
Appendix B1 – Concrete Details
Appendix B1 – General Arrangement
Appendix B1 – Longitudinal Sections
Appendix B1 – Reinforcement Details Cellular Structure
Appendix B1 – Reinforcement Details Wing Walls
Appendix B1 – Alternative Site Development Plan
Appendix B2 – Environmental Sensitivity
Appendix D1 – Western Cape Biodiversity Spatial Plan Map
Appendix D2 – Freshwater Resources Map
Appendix D3 Ecosystem Threat Status Map
Appendix D4 – Site Development with Overlay Sensitivity Map
Appendix D5 – Site Sensitivity Verification Report
E20 A Animal Species TOR_VaroiusCulverts
E 20 B Aquatic TOR _VariousCulverts
E 20 C Plant Species TOR_VariousCulverts
E 20 D Terrestrial Biodiversity TOR_VariousCulverts
Appendix F1 – I AP Public Document
Appendix F2 – Site Notices and Adverts
Appendix G1 A – Aquatic assessment report_Garden Route culverts_Bitou
Appendix G2 B – Bitou_Avifauna Compliance Statement
Appendix G 3 C- Plant, Animal and Terrestrial Compliance Statement
Appendix G 4 D – Heritage Statement Bitou Road and Culverts – Final
WU42368_GA Registration Certificate-GR Culverts
Appendix H – Environmental Management Programme
Appendix I – Screening Tool Report
Appendix L – Engineering Report and Drawings